Real Thai operating numbers: the EV Low-Priority tariff, system losses others don’t show, and utilization observed across the Thai fleet. Adjust anything — the maths is open.

Station

Civil works and roof/canopy — foundations, slab, bay marking, drainage and canopy. The preset assumes an already-paved, level site. A new slab with a full canopy typically runs ฿180,000–250,000 per bay, so set this to your own contractor’s figure before you rely on the result.
This configuration wires up to 12 connectors. A bigger station is a bigger preset.
The price you advertise to drivers. The model works ex-VAT below this — at 7% VAT that is ฿7.01 per kWh of revenue.

Energy & tariff

PEA/MEA EV Low-Priority tariff — global rate · as of 2026-07-10
ERC — fixed through Dec 2026 (16.23 satang) · as of 2026-07-01

Utilization scenarios (kWh per gun per day)

Utilization % assumes ~50 kW average delivered per busy gun-hour.
2.1–5.9years to pay back — best to worst utilization case, at 7.50 ฿/kWh incl. VAT. Probability-weighted expectation: 3.1 years (worst 10% · average 60% · best 30%).
Worst case
15% utilization · seen at ~10% of sites
5.86 yrs payback
Net profit ฿1,927,557/yr
IRR 11% · 778 MWh/yr
Average case
25% utilization · seen at ~60% of sites
3.07 yrs payback
Net profit ฿3,681,760/yr
IRR 30% · 1,296 MWh/yr
Best case
35% utilization · seen at ~30% of sites
2.08 yrs payback
Net profit ฿5,435,962/yr
IRR 47% · 1,814 MWh/yr
No.1 station in Thailand
Observed ceiling at a real station — 61% utilization, estimated from continuous status observation, not billing data
1.13 yrs payback
Net profit ฿9,996,889/yr
IRR 88% · 3,162 MWh/yr

10-year cumulative cash flow

020M40Mbreak-even (0)THBY0Y2Y4Y6Y8Y10Worst caseAverage caseBest case

Break-even

This site pays back in 5 years at just 203 kWh per gun per day (~17% utilization).

Sensitivity — average case payback (years)

ChangePayback (base 3.07)
Utilization 180 kWh/gun/day (15%) — Worst case5.86
Utilization 420 kWh/gun/day (35%) — Best case2.08
Price -0.50 ฿ (at the gun)3.64
Price +0.50 ฿ (at the gun)2.65
Losses 5%3.03
Losses 10%3.23
CAPEX -10%2.76
CAPEX +10%3.38
Civil + roof ×2 (new slab and canopy)3.29

The link carries the numbers, not a picture of them — whoever opens it can change any input and see what it does.

The full working — Average case

Energy sold (DC, into the car)108,000 kWh/mo
Energy at the meter (AC, incl. losses)114,894 kWh/mo
Revenue฿757,009/mo
Electricity cost (incl. service fee)฿354,012/mo
Effective cost per kWh sold฿3.28
Gross profit฿402,997/mo
Landlord฿50,000/mo
CPO fee฿37,850/mo
Net per month฿315,147
Net per year (after O&M)฿3,681,760
Total investment฿11,300,000
Payback3.07 years
Sessions per day (~30 kWh each)120

Every assumption, sourced and dated

EV Low-Priority energy rate (ex Ft/VAT)2.9162 ฿/kWhPEA/MEA EV Low-Priority tariff — global rate · 2026-07-10
Ft (fuel adjustment)0.1623 ฿/kWhERC — fixed through Dec 2026 (16.23 satang) · 2026-07-01
Monthly service charge฿312.24/moPEA/MEA Low-Priority schedule (demand charge waived) · 2026-07-10
System losses (AC meter → DC into the car)6.0%Engineering estimate — transformer, PU conversion, cabling, standby/cooling · 2026-07-26
Selling price at the gun (incl. VAT)7.50 ฿/kWh (ex VAT 7.01)Typical Thai ultrafast sell price, as advertised to drivers · 2026-08-07
Average delivered power per busy gun-hour50 kWDisplay assumption — used ONLY to express kWh/gun/day as a utilization %; it is not an input to the revenue or cost maths · 2026-07
Utilization bands: Thailand fleet observation — multi-network, 200+ stations, 2026 · Next Ft revision ~Dec 2026 (for Jan–Apr 2027) · Selling price is entered incl. VAT, as advertised at the gun; the model then runs ex-VAT on both sides, because a VAT-registered operator remits output VAT and reclaims input VAT. Every result below the price is ex-VAT.
What this model leaves out. Corporate tax, insurance, downtime and warranty events, financing cost and interest, land purchase, and price escalation are not modelled, and cash flows are not discounted — the figure above is simple cash payback, not an NPV or IRR appraisal.
Total investment ≈ 2× equipment price (equipment + transformer, grid connection, installation), excluding civil works and roof/canopy — those are the separate "Other CAPEX" input. · Equipment price per the FusionCharge packages — see Configurations & price

Run these numbers against your actual site.

The defaults here are a typical Thai site. Leave your details with your location, land cost or expected traffic and Ralph and the Thailand FusionCharge team will re-run this model on your real inputs — including a quotation for the civil works this calculator only estimates.

Would rather just ask?Chat on LINE